(Heren Energy) - Day-ahead at Zeebrugge dropped to 14.85 p/th in the early morning session on the back of injection problems at the UK ’s Rough storage, before climbing later to trade at 15.20 p/th.
The majority of deals were concluded over the day between +1.5 p/th and +1.75 p/th basis to the NBP. Bidders reportedly met an absence of real selling interest in the late afternoon with a 15.50 p/th offer appearing, before the contract followed the NBP downwards at the close. Interest remained mute in the other prompt contracts where spreads widened. In the curve December ’03 dealt a
Mittwoch, 20.08.2003, 08:11 Uhr
Redaktion
© 2024 Energie & Management GmbH